Precautions and solutions for transformer withstand voltage test

:2023-06-06 15:07:23:

In the power system, transformers are an important type of power equipment, and their stability and reliability are crucial for ensuring the operation of the power grid. The transformer withstand voltage test is one of the important means to ensure its normal operation. However, when conducting transformer withstand voltage tests, some difficulties may be encountered. This article will introduce these difficulties and provide corresponding solutions.


1. Insulation problem of high-voltage winding:

When conducting transformer voltage withstand tests, the high-voltage winding is the most prone part to problems. Because of the bad working environment and strong electric field, the high-voltage winding is prone to partial discharge and breakdown. This not only affects the test results, but also causes damage to the equipment.

Solution: Before the test, the high-voltage winding should be comprehensively inspected, and appropriate test technology and equipment should be used to reduce the risk of partial discharge and breakdown. At the same time, materials such as insulating oil and paper can also be used to improve the insulation performance of high-voltage windings.

MVIMG_20230223_134831.jpg

2. Selection of testing equipment:

Choosing appropriate testing equipment is also a key issue when conducting transformer withstand voltage tests. Different testing equipment has different characteristics and applicability, so it is necessary to choose according to the actual situation.

Solution: When selecting testing equipment, consideration should be given to factors such as transformer type and rated voltage, and equipment with high accuracy and good stability should be selected. At the same time, attention should be paid to correct use and maintenance during use.


3. Safety issues:

Transformer withstand voltage test is a high-risk task, and improper operation can cause injury to personnel. Therefore, when conducting testing, it is necessary to strictly comply with safety regulations and operating procedures.

Solution: Before conducting testing, personnel should be trained and equipped with professional personnel for operation. At the same time, attention should be paid to preventing risks such as electric shock and fire during operation, and corresponding safety devices and first aid measures should be equipped.

IMG_20230512_171030.jpg

In summary, when conducting transformer withstand voltage tests, it is necessary to fully consider the above difficulties and take corresponding measures to reduce risks. Only in this way can the test results be accurate and reliable, while ensuring the safety of equipment and personnel.


Kvtester Electronics Technology Co.,Ltd. is a high-tech enterprise specializing in power testing, testing, research and development, production, and sales of testing equipment. It has been engaged in the electrical testing industry for many years, and its products are of high quality. We welcome customers to come and purchase.